Turnkey-Machine-Safety

IES takes turnkey projects basis for whole plants, where we divide whole machine safety compliance project into four steps as describes below

  • STEP 1: Current Machine Guarding Survey
  • STEP 2:The Machine Guarding risk assessment
  • STEP 3: Machine Guarding Design and Engineering
  • STEP 4: Implementation and Validation of safety measures

STEP 1: Current Machine Guarding Survey

IES conducts walk through safety audit for whole plants machinery and inspect current situation of machine guarding and safety implementation in each machine. By having outside evaluators who haven’t seen the operation day in and day out, offer “fresh experienced eyes” and typically are more critical of a company’s processes. The surveyors spend five to 10 minutes per machine evaluating the status of machine safety implementation

STEP 2 The Machine Guarding risk assessment

In second step, IES team do detail study of each machine for in terms of machinery safety , Interact with the all the stockholder of that machinery , Safety related control systems are studied and tested of that machinery , All safe guard which is placed in machine are evaluated and tested as accordingly relevant standards of that particular machinery . All the short comings of machinery in terms of safety are documented in the report, Suggestion and remarks are given where deficiencies are found in the machine.

STEP 3: Machine Guarding Design and Engineering

In third step , We do prepare drawings for guards , selection of safety devices and interlocking switches , safety related control circuit designs. Those are done with the consultation with customer, BOM is prepared for each machine with details spec and drawings where applicable. cost estimation is derived for project implementation.

STEP 4 : Implementation and Validation of Safety Measures

In fourth step , We do manufacture all the mechanical guards which are designed in step 3 , source all the required safety devices and ancillary items of electric nature. Install and commissioning of all electrical and mechanical items on the machine. Final Report preparation and FAT tests of safety functions. Operators and plant personnel training on site .